Jasra Interchange – Loop 1 Widening

HHG has completed the widening of JASRA interchange Loop 1 in April 2023. The Project included Widening of Jasra interchange Loop 1 from current single lane to double lane.

The project also included design and build micro-piling works to protect the abutment of the existing bridge , the supply and installation of 300mm diameter contiguous micro piles under Jasra Interchange using specialized techniques, this is the first project in Bahrain utilizing micr0-piles for underpass abutment protection.

Bridge Barriers for Jasra Interchange Upgrade

Widening of Shaikh Isa Bin Salman Highway & Jasrah Interchange upgrade Phase-2:

BPC produced and installed precast concrete bridge parapet Barriers for 5-brdige of total approx. length 3,700m

Divisions Involved

HHG has completed the widening of JASRA interchange Loop 1 in April 2023. The Project included Widening of Jasra interchange Loop 1 from current single lane to double lane.

The project also included design and build micro-piling works to protect the abutment of the existing bridge , the supply and installation of 300mm diameter contiguous micro piles under Jasra Interchange using specialized techniques, this is the first project in Bahrain utilizing micr0-piles for underpass abutment protection.

Bridge Barriers for Jasra Interchange Upgrade

Widening of Shaikh Isa Bin Salman Highway & Jasrah Interchange upgrade Phase-2:

BPC produced and installed precast concrete bridge parapet Barriers for 5-brdige of total approx. length 3,700m