Tunnel-J

The Construction of South Bahrain loop road stage 2 (Tunnel J) project involves the Demolition work of Existing Carriage way, constructing Storm Water Drainage Pipeline Network, Elevating the Main Road , Cast Insite Concrete Tunnel (Under Pass).

Divisions Involved

The Construction of South Bahrain loop road stage 2 (Tunnel J) project involves the Demolition work of Existing Carriage way, constructing Storm Water Drainage Pipeline Network, Elevating the Main Road , Cast Insite Concrete Tunnel (Under Pass).