Haji Hassan Readymix has supplied over 250,000 m3 of high-grade concrete using special aggregate products. Sitra Bridge and the new interchange categorized by the Bahrain Ministry of Works as a critical piece of infrastructure required for the country’s development, and designed as a 100-year life-of-structure project.
Divisions Involved
Haji Hassan Readymix has supplied over 250,000 m3 of high-grade concrete using special aggregate products. Sitra Bridge and the new interchange categorized by the Bahrain Ministry of Works as a critical piece of infrastructure required for the country’s development, and designed as a 100-year life-of-structure project.

